مشاريع الطاقة الناجحة



Project Scope
Engineering & design,procurement, supply & delivery of all required materials & equipment to the work site, construction installation, testing & commissioning & put into service for installation of underground cable 33KV to feed the metro substation for L1,L3 & L5 from station 9052 to 9054 in Riyadh city.

Project Scope
Install, remove, replace, modify and maintain MV & LV overhead & underground distribution networks up to 36 KV




Project Scope
Design, engineering, supply, installation, operation & testing of 132 kV high voltage cables with all civil works, joint & termination works of cable, HDD works, fiber optic network laying works between & inside substations, protection works, cybersecurity solutions, & works of supplying, installing & configuring telecom devices inside the stations &2 Bay GIS Works.


Project Scope
Design, engineering, supply, installation, operation and testing of 132 kV high voltage cables with all civil works, joint & termination works of cable, HDD works, fiber optic network laying works between and inside substations, protection works, cybersecurity solutions, and works of supplying, installing and configuring telecom devices inside the stations.




Project Scope
Medium & low voltage electrical works, installation & supply of electrical switches & electrical transformers, supply & installation works for external lighting, communications works, water & drainage network works, water & floods, civil works, & works for supplying and installation of external fences.


Project Scope
Design, engineering, supply, installation, operation and testing of 110 kV high voltage cables with all civil works, joint & termination works of cable, earth works, HDD works, and fiber optic network laying works between and inside substations.




Project Scope
Design, engineering, supply, installation, operation and testing of 110 kV high voltage cables with all civil works, joint & termination works of cable, earth works, HDD works, and fiber optic network laying works between and inside substations.


Project Scope
Design, Engineer, Supply and Deliver all equipment & materials to the work site construct, Dismantle install, Test, Commission, & put the project into service




Project Scope
Design, engineering, supply, installation, operation and testing of 115 kV high voltage cables with all civil works, joint & termination works of cable, HDD works, fiber optic network laying works between and inside substations, protection works, cybersecurity solutions, and works of supplying, installing and configuring telecom devices inside the stations.


Project Scope
Design, engineering, supply, installation, operation & testing of 132 kV high voltage cables with all civil works, joint & termination works of cable, HDD works, fiber optic network laying works between & inside substations, protection works, cybersecurity solutions, & works of supplying, installing & configuring telecom devices inside the stations &1Bay GIS Works.


POWER SUCCESSFUL PROJECTS


مشروع تركيب كابلات أرضية 33 ك.ف. لتغذية محطات مترو الرياض
مدة المشروع: 5 سنوات

العقد الموحد لشبكات التوزيع منذ عام 2008م
مدة المشروع: 5 سنوات

ربط محطة النظيم المركزية جهد 132 ك.ف. في مدينة الرياض
مدة المشروع: 22 شهر

ربط محطة العارض المركزية جهد 132 ك.ف. بمدينة الرياض
مدة المشروع: 22 شهر

مشروع الحديقة المائية - القدية
مدة المشروع: 18 شهر

تركيب شبكة كابلات أرضية جهد 100 ك.ف. لمحطة الحرم 3 الفرعية بالمدينة المنورة ضمن برنامج تقوية الشبكة للمدن الكبرى
مدة المشروع: 21 شهر

تركيب شبكة كابلات أرضية جهد 100 ك.ف. لمحطة غرب طيبة الفرعية بالمدينة المنورة ضمن برنامج تقوية الشبكة للمدن الكبرى
مدة المشروع: 21 شهر

مشروع استبدال الشبكة الكهربائية القديمة جهد 33 ك.ف. بمدينة الرياض
مدة المشروع: 24 شهر

مشروع الربط تبادلي بين محطة غرب الخبر ومحطة غرب الخبر-2
مدة المشروع: 21 شهر

مشروع ربط المحطة 8781 والمحطة 8787 بكابلات الجهد العالي 132 ك . ف . بوادي الدواسر
مدة المشروع: 25 شهر

Progress 100%

Progress 20%

Progress 100%

Progress 21%

Progress 85%

Progress 100%

Progress 35%

Progress 90%

Progress 100%

Progress 20%

Progress 45%

Progress 100%

Progress 100%

Progress 100%